Construction Excellence in Every Detail
Each project stands as a testament to our ability to deliver durable, aesthetically pleasing, and sustainable results.
Browse Our Work
Concrete
JW Mitchell High School
Concrete sidewalk installation, ADA ramps, and crosswalk at active high school campus.
Infrastructure
AdventHealth Corporate Center
Multi-phase solar canopy support — curbing, paving, sealcoating across 186,673 SF.
Healthcare
Florida Orthopedic Center
ADA upgrades, asphalt repairs, curbing replacement at active medical facility.
Commercial
CVS Retail Locations
359,087 SF asphalt, concrete, and storm drain servicing across multiple retail sites.
Infrastructure
New College of Florida
Reinforced roadway construction under constrained site conditions with overhead utilities.
Stormwater
Stormwater Infrastructure Repair
Failed underground stormwater system repair with roadway and drainage restoration.
Stormwater
Galvanized Storm Grate Replacement
Corrosion-resistant galvanized steel grate replacement in coastal environments.
Concrete
Sidewalk Path with Stairs
New pedestrian pathway and stair system across uneven terrain.
Environmental
Custom Fish Grate & Water Control
Custom galvanized steel grate and synthetic water control system in sensitive area.
Infrastructure
St. Pete Clearwater Airport
26,342 SF asphalt paving, curbing, fencing in active airport environment.
Stormwater
BayCare Ballpark
Trench drain installation and reinforced concrete sidewalks at high-traffic public venue.
In-Depth Project Profiles
A closer look at the scope, challenges, and results behind our most notable work.
St. Pete Clearwater Airport
Full-scope site work within an active airport environment requiring strict safety compliance and coordination with regulated operations.
Scope of Work
- Concrete curbing repairs (40 LF)
- Roadway base restoration (500 SF)
- Asphalt paving (26,342 SF)
- Dumpster pad installation
- Fencing installation (60 LF)
- Pavement striping
Context
Active airport environment with regulated operations requiring strict coordination and safety protocols.
Result
Site restored for safe, compliant airport operations.
AdventHealth Corporate Center
Multi-phase, 18-month solar canopy support project at an active healthcare corporate campus, coordinating across trades and traffic zones.
Scope of Work
- Concrete curbing (1,151 LF)
- Asphalt paving (16,783 SF)
- Sealcoating & striping (186,673 SF)
- Traffic control coordination
Context
Multi-phase, 18-month project at active healthcare facility requiring continuous coordination with site operations.
Result
Enabled sustainability infrastructure while preserving site functionality.
CVS Retail Locations
Large-scale pavement maintenance and storm drain servicing program across multiple active retail locations, keeping stores open throughout all work phases.
Scope of Work
- Asphalt repairs & sealcoating (359,087 SF)
- Concrete repairs & flatwork (17,147 SF)
- Lift station & storm drain servicing (15 EA)
- Pavement striping
Context
Multiple active retail locations remaining open during work, requiring phased scheduling and minimal customer disruption.
Result
Extended pavement life with minimal disruption to business operations.